ABC Shiploader Facility
WGA replaced a 120 tonne bulk cement shiploader boom on the Port River in South Australia, leveraging three of our specialist skill areas.
Our heavy lift capability specified an appropriately sized land-based crawler crane, complete with superlift attachment, while our maritime group provided water-based plant and equipment engineering services for the scope of the temporary work including barging of the new ship loading boom into position for lifting. Finally, our geotechnical engineers ensured that the 1,000 tonnes of heavy crane was stably perched on the edge of the riverbank.
Key Personnel
The ABC Shiploader Facility is included in the following sectors & services.
Click on one to find out more about that sector or service.