Port Hedland Berth 1 Conveyor Upgrade
WGA designed an upgraded conveyor system along Wharf 1 in Port Hedland for the Pilbara Ports Authority, including an extension of the existing conveyor to reduce the number of transfer points. The project also included the redesign of transfer chutes and mobile conveyor upgrades, with a focus on constructability and maintenance.