Wyndham Jetty

The project involved the design and construction supervision of a new community jetty, along with a 40m long berthing pontoon to service vessels ranging from 5m to 50m in length. All-tide access was provided via a 45 m long hinged gangway. WGA’s design of construction aids, including a hydraulically adjustable pile guide for the installation of 43m long raker piles, was a critical component in the successful completion of the project.