The Project
CBH approached WGA to compile an options study for the replacement of the existing gravity take-up unit (GTU) at the Kwinana Grain Terminal to improve safety and maintainability.
Technical Solutions
The existing GTU structure was not compliant with the relevant standards and presented several significant hazards during routine access and isolation.
Client Focus
The final design included dedicated take-up winches and remote lubrication systems, which eliminated the need for access to the structure and reduced ongoing maintenance costs and downtime.
The CBH Gravity Take-up Unit Replacement is included in the following sectors & services.
Click on one to find out more about that sector or service.