Refine Energy

WGA AU | Wallbridge Gilbert Aztec - Photo: Refine Energy

WGA conducted In-Service Pressure Vessel inspections for Refine Energy’s Jingemia Production facility at Dongara, WA. Two of the Production Separators have corroded areas in the shell of the vessels. To extend the life of the asset, WGA undertook engineering analysis to calculate the safe working life of the vessel and submitted documentation to Worksafe WA for the revised design registration.


The Refine Energy is included in the following sectors & services.
Click on one to find out more about that sector or service.